The Permit Map
How building a new home generally works in unincorporated Monterey County, in plain English.
Last reviewed: November 2026. Official links checked monthly.
-
Learn what your land allows
Before you buy or design anything, find out your parcel's zoning (what can be built there) and which area plan it falls under. Different parts of the county have their own plans, for example North County or the Toro area. Also look for things that add steps: steep slopes, oak trees, creeks, fire hazard zones, earthquake faults and landslide areas, archaeological sites, scenic areas where homes must blend into the view, and whether water and sewer are available. If your land is near a mapped fault, the state may require a geologic study before you can build.
Tip for buyers: do this before you close on land. It's the cheapest step and the one that saves the most heartache.
Official: County GIS maps · Land use regulations · 2010 General Plan · State earthquake zone map
-
Talk to the county early
HCD staff can tell you what your project is likely to need before you spend money on plans. Ask what studies your parcel might require. Bring your parcel number (APN).
Official: Planning: getting started · Permit Center
-
Water and septic
On raw land, you usually need to show you have a reliable water source (often a well) and a place for wastewater (usually a septic system). These are reviewed by the county's Environmental Health bureau and often need tests, such as well yield, water quality, and soil percolation tests, before your building permit moves forward.
Official: Wells · Septic system permits · Environmental Health land use review
-
Site studies
Depending on your land, you may need a soils/geotechnical report, a survey, a biological or tree assessment, drainage and grading plans, or fire-safety requirements such as road access and water storage for firefighting. Your designer or engineer will help pull these together.
Official: Preparing a site plan · Grading · Defensible space
-
Planning approval (if needed)
Some projects can go straight to a building permit. Others first need a planning permit or design approval, which can involve public notice and environmental review. This is often the longest and least predictable step, so it's worth asking about early.
Official: Planning application process
-
Building permit and plan check
Your designer submits construction plans. County reviewers (building, fire, public works, environmental health and others) check them and send back comments. You revise and resubmit until approved. Applications and status checks happen through the county's online permit portal.
Official: Plan check · Permit fees & types
-
Build, with inspections along the way
Once the permit is issued, construction begins. Inspectors visit at set stages: foundation, framing, electrical, plumbing, insulation, and so on. Don't cover up work before it's been inspected.
Official: Building inspections
-
Final inspection and moving in
When everything passes final inspection, the permit is closed out and the home can be lived in. Keep every document; you'll want them if you ever sell or remodel.
Already built without a permit?
You're not alone, and there is usually a way forward. Permitting work after the fact generally means documenting what's there, bringing it up to current code, and paying fees. It's often harder and more expensive than permitting first. If you've received a code enforcement notice, respond to it, keep copies of everything, and consider talking to a professional.
Official: Clearing a code violation · Code compliance FAQs · HCD Ombudsperson
Official sources
- Monterey County Housing & Community Development: planning, building, code compliance
- Monterey County Environmental Health: wells and septic
- Online permit portal (Accela Citizen Access): apply for and track permits
- Building & Planning Services FAQs