Project Map › Water

Deal-breaker #1

Water

Where it comes from, how it gets up the hill, and how much you'll need to keep on hand for firefighting. The county checks every new home's water supply before it approves a building permit, so this is the first thing to rule out.Source

Who's involved
County Environmental Health, your water company or a licensed well driller, your civil engineer, and the fire agency for your area.
What it shapes
Where the house, well, septic field and tanks can go, and a real slice of your budget.
When it matters most
Before you buy, and before you pay for design.
Before anyone digs

In Monterey County, treat any physical work on raw land as needing county approval until the county tells you otherwise. For water work alone:

When in doubt, call the county Permit Center before you touch it: (831) 755-5025.

This tailors the page and your Project Map. Saved on this device only.

How water connects to everything else

Who to call

Numbers and offices from each agency's own website, checked November 26, 2026.

County Permit Center

Your first call for anything you plan to build, dig or install. Ask which permits and reviews apply to your parcel.

(831) 755-5025 · 1441 Schilling Place, Salinas

Permit Center website →

County Environmental Health

Wells, water quality, water systems and septic. They review every new home's water supply.

(831) 755-4500 main · (831) 755-4507 wells and land use

Well program website →

Your fire agency

Sets your firefighting water, hydrant and driveway requirements. To find yours:

  1. Look up your address on CAL FIRE's fire hazard map. It shows your fire hazard zone and whether you're in a State Responsibility Area, where CAL FIRE handles wildland fire.
  2. Find your parcel on the county's map of every fire district (from LAFCO, the county agency that sets district boundaries), then pick your district from the list below.Source
  3. Still not sure? Ask the Permit Center which fire agency will review your plans.
Fire protection districts in unincorporated Monterey County (10 districts, roughly north to south)

From LAFCO of Monterey County. Each has its own boundary map. Inside a city, the city's fire department usually serves you instead.

Also serving parts of the county: Pebble Beach Community Services District, and the Big Sur and Mid-Coast volunteer fire brigades.

  1. 1

    Before you buy

    Find out where water would come from, and how hard it is to get it to the spot where the house would go.

      Ask the water company
      • Can you serve a new home on this parcel, and will you put that in writing?
      • Where does your line end, and who pays to extend it?
      • What are the connection fees? Is there a monthly charge before we're hooked up?
      Ask neighbors, local well drillers and the county
      • How deep are wells around here, and how many gallons a minute do they produce?
      • Have any gone dry, or needed treatment for the water quality?
      • Does this area have its own well rules? New well applications get extra review under state executive orders, and some areas add their own requirements: the Salinas Valley Basin groundwater agency, the Monterey Peninsula Water Management District, and the Pajaro Valley Water Management Agency in the north county.SourceSource
      What we learned

      We've paid a monthly community water bill for years, for a meter that isn't connected to anything yet. Raw land is a long, quiet subscription. Budget for it.

    • 2

      Can I build here?

      Prove the water is there, and figure out how it climbs to the house.

        Meter Booster pump Storage tank House Our climb: about 275 feet
        An illustration, not a design: a pump pushes water to a tank above the house, and gravity does the rest. Your engineer designs what fits your land.
        The physics of uphill water

        Every 2.31 feet of climb takes one pound per square inch (psi) of pressure.Source Lifting water our 275 feet takes about 119 psi before it even reaches the tank, plus more to overcome friction in a long pipe. That's why uphill homesites need pumps.

        It works the other way too. A tank 185 feet above the house pushes about 80 psi, the most California's plumbing code allows inside a home without a pressure regulator.Source So tank height is a design decision, not just "as high as possible."

        About the well tests

        Any well meant for drinking water needs a continuous pumping test to show how much it produces. For a new home, Environmental Health witnesses it. A new single-home well also needs a full water quality panel (minerals, metals, nitrates and bacteria) from a state-certified lab.Source The county's written test procedures give the details, so get the current version before you schedule the test.

      • 3

        Design

        Put the tanks, the well and the water line on the site plan, and size them for both the house and firefighting.

          Fire water: how much, and where it goes

          If your land is in a State Responsibility Area, the state's Fire Safe Regulations require emergency water for wildfire protection.Source Locally, Monterey County's standard fire conditions, approved by the county's fire prevention officers, spell it out for a single parcel:Source

          • Under 3,000 square feet of buildings: at least 4,900 gallons for firefighting.
          • 3,000 square feet or more: at least 9,800 gallons. Over 10,000 square feet, more may be required.
          • That water is on top of what the household uses, and must always be available.
          • A fire hydrant or fire valve with a 2½-inch outlet, 4 to 12 feet from the driveway or road, between 50 and 1,000 feet by road from the house, marked with a blue reflector.

          These are standard conditions, so your fire agency may adjust them, and the copy we found (posted by Monterey County Regional Fire District) is dated 2017. Confirm with your fire agency before design is far along, because a tank needs room, a level pad and truck access.

        • 4

          Permits

          Water isn't a separate permit you get at the end. Environmental Health signs off on it as part of your building permit review.Source

          • 5

            Build

            • 6

              Move in and beyond

              Real numbers

              What water actually cost, from us and from readers. Every number has a year, because prices move.

              WhatCostSource
              Monthly bill for an unconnected meterCraig: add oursUs, 2026
              Line, pump and tank to a homesite 275 feet upWaiting on bidsUs, coming 2027
              County well construction permit (2026)$3,920County fees
              County witness of the well yield test (2026)$1,042 for alluvial soil (first 4 hours) or $1,561 for hard rock (first 6 hours), then $259 an hourCounty fees
              County well permit extension (2026)$519 minimumCounty fees
              County staff to witness the well seal on a weekend or holiday (2026)$906 for the first 3 hoursCounty fees
              New connection or meter feeNo reports yetShare yours
              Well drilling and pump testNo reports yetShare yours
              Water quality lab testsNo reports yetShare yours
              "Water, it turns out, does not enjoy hiking uphill nearly as much as we do."
              Read Entry 1: The Box of Reports →

              Sources

              Every fact above links to its source. Checked November 26, 2026, and rechecked monthly.

              Not legal or engineering advice. Rules change and every parcel is different. Confirm with Monterey County Environmental Health, the Permit Center and your engineer.

              Your checkmarks here also appear on the Project Map, where you can save your progress or join the waitlist for project accounts.