Project Map › The house
Design it to fit the land
The house
After the water, the septic, the road, the dirt and the trees, you finally get to the part you pictured in the first place: the house. This guide walks through getting it designed, approved, built and signed off, step by step. And because almost everyone with rural land eventually asks "could I build a second one?", that's answered near the end.
- Who's involved
- A designer (architect, building designer or draftsman), a structural engineer, an energy consultant, your contractor, and the county: Planning (zoning and Design Approval) and Building Services (plan check and inspections).
- What it shapes
- The house's look, size and cost, how long the permits take, and when you can move in.
- When it matters most
- Once the five deal-breakers are answered. Design the house to fit what the land allows, not the other way around.
The house in Monterey County, in four facts
State law lets anyone prepare plans for a single-family wood-frame house up to two stories plus a basement. Any part outside standard framing needs a licensed architect's or engineer's stamp.Source Who to hire.
Many parcels need a Design Approval, or another planning permit, before the county will accept the building permit.Source The steps, in order.
Studies, the well and planning approvals can come first. Septic and most construction wait for the house permit, and every permit starts a clock.Source Build it in pieces.
One RV or mobile home on the lot while you build the first house, for up to 18 months after the building permit.Source The rules.
Who designs the house?
- Which houses have you taken through Monterey County permits in the last few years? Can I call those owners?
- Who does the structural and energy work, and is it in your price?
- Do you answer the plan check comments, and how do you bill for revisions?
- Who's pushing the county along when it stalls? (Somebody has to. See Money and team.)
From sketch to move-in
- Site plan first. Everything on one drawing: the house, driveway, well, septic field and reserve, water tanks, propane tank, solar, protected trees, slopes and setbacks. The other guides on the Project Map each add a piece.
- Concept design. Rough floor plans and the look of the house, sized to the site plan and your budget.
- Planning approvals. If your parcel has a design overlay, you need a Design Approval, from over the counter ($640 in 2026) to a public hearing ($3,750).Source Steep slopes, tree removal or other issues can mean a bigger planning permit first. See The land and its rules.
- Construction drawings. The full set: architectural plans, structural design, energy code forms, fire sprinklers and fire-safe construction (see Fire safety), plus the septic and well designs.
- Building permit and plan check. Apply through the county's online permit portal.Source Reviewers send back "plan check comments," your team revises, and you resubmit until it's approved. What that means. Then you pay the fees and the permit is issued. What it costs.
- Build, with inspections. Inspections at each stage: foundation, framing, electrical, plumbing, insulation and more. Don't cover anything before it's inspected, or it gets uncovered.
- Final inspection and move-in. Once the house passes final, you can move in. If one last item is holding you up, the county can issue a temporary certificate of occupancy ($1,887 in 2026).Source
- Keep every document. Plans, permits, inspection cards, the septic and well records. Future you, your insurer and your buyer will all want them.
What are "plan check comments"?
"Plan check" is the county reviewing your construction drawings before it issues the permit. "Comments" are the list it sends back of everything that's missing, unclear or doesn't meet code. Think of it as the county's red pen. It's normal, and almost nobody gets approved on the first try.
- Who reviews. Building Services checks the drawings against the building codes. Other offices may review their pieces too: Planning for zoning and any conditions of approval, and Environmental Health for the well and septic, which has its own review fee ($1,206 per building permit in 2026).Source
- What a comment looks like. Usually a numbered item pointing to a sheet in your plans. Typical examples: show a dimension that's missing, add a detail for how something attaches, provide a signed energy form, or make the site plan match the septic design.
- How you answer. Your designer, engineer or energy consultant revises the drawings, and writes a short response to each numbered comment saying what changed and where. Then you resubmit through the county's permit portal.Source
- Then it goes around again. The reviewers check the changes and either approve or send a shorter list. Extra rounds can add re-review time, billed at $220 an hour in 2026.Source
The secret to fewer rounds: answer every comment, completely, in one resubmittal. A half-answered list just comes back. And ask your designer up front whether answering comments is included in their price.
Can you build it in pieces?
Most of us can't pay for the whole thing at once, so the natural plan is a driveway this year, power next year, the house when the money's there. Some of that works. Some of it runs straight into rules that only make sense once the house is permitted, and that's where the circular, chicken-and-egg feeling comes from. You're not imagining it. Here's the map.
What can go first, on its own permit?
| Piece | Before the house permit? | The catch |
|---|---|---|
| Survey, perc test, soils report | Yes | They're studies, not construction. The county needs them before it will approve the house anyway, so they're the best early spend. See Wastewater and Ground. |
| The well | Yes, on its own well permit | Environmental Health issues well permits separately, which is why people drill early to prove the water. An open code violation on the property stops a well permit until it's cleared.Source See Water. |
| Planning approvals for the whole project | Yes, and they're the best place to "park" | A Use Permit generally stays good if construction starts within two years of approval, and you can ask for an extension before it runs out.Source See permit clocks. |
| The driveway (a grading permit) | Maybe. Ask. | A grading permit is its own permit, but the fire agency's conditions have to be cleared before any grading or building permit is issued,Source and the county reviews the driveway as part of the house it serves, not on its own.Source Once issued, work has to start within 120 days, and a 30-day stop can expire it.Source |
| Power to the site | Temporary power, yes. Permanent service, ask. | PG&E offers temporary construction power, and its online application asks you to upload your permits where they apply.Source Ask PG&E what it needs before it will design a permanent line to a house that isn't permitted yet. See Power. |
| Water tanks | Sometimes | Even with no building permit, a tank can need a Design Approval in a design-control zone.Source |
| A barn or shop | Only with a Use Permit (in RDR zones) | Accessory buildings before the main house need a Use Permit from the Zoning Administrator.Source |
| The septic system | No | The installation permit comes only after the building permit is approved by every agency.Source |
| An ADU, or living on site | No | Both come with or after the main house's building permit. See living on site. |
The loops that drive people crazy
A phasing plan that works with the rules
Not sure what the five deal-breakers are? Water, wastewater, access, ground and power. See them on the Project Map.
We've had our land for ten years, while the Air Force continued to move us around the world. (We're not settled yet!) We'd have loved to chip away at it: the driveway one year, power the next, the house when we got there. Instead we mostly walked it and dreamed. We planted a tree here and there and scattered wildflower seed, because the rules really want the whole plan, and the money for it, all at once. If that's you, spend what you can on the "prove it" pieces, get your approvals in hand, and let yourself enjoy the land while you save. The wildflowers don't need a permit.
- Can I get a grading permit for the driveway before the building permit, and what would you need to see?
- How long do my planning approvals last, and can I extend them?
- What counts as "active" on a permit, so it doesn't expire between phases?
What the building permit costs
County Building Services fees, effective April 4, 2026, are based on the project's valuation, which the county figures from national building cost data, not your contract price:Source
| Fee | 2026 amount |
|---|---|
| Inspection fee, house valued $500,001 to $1,000,000 | $5,861.41, plus $2.61 per $1,000 over $500,000 |
| Inspection fee, house valued $1,000,001 to $5,000,000 | $7,167.68, plus $0.44 per $1,000 over $1,000,000 |
| Plan check, single-family house | 65% of the inspection fee |
| Plan check, new ADU up to 750 sq ft, or a JADU | 32.5% of the inspection fee |
| Standardized ADU plan review | $646 |
| General Plan management and technology fees | 15% and 13% of the permit fee |
| Temporary certificate of occupancy | $1,887 |
Those are just Building Services. Planning permits, grading, septic, well, fire, school and traffic fees all come on top. See Money and team for the whole stack and the county's fee estimator.
Living on site while you build
You can live in an RV, travel trailer or mobile home on the lot while you build the first house:Source
- Only one, and only if there's no other home on the lot.
- Not until the building permit for the house is issued, and construction has to start within 60 days.
- It needs its own permits, plus water and septic hookups approved by Environmental Health.
- It ends 18 months after the house permit, or when you move into the house, whichever comes first. A mobile home has to go. An RV can stay, unplugged.
Changes to those rules need an Administrative Permit. Eighteen months goes fast on a custom house, so plan the schedule with it in mind.
Build order matters
Want to build the barn or shop first and the house later? In the Rural Density Residential zone, accessory buildings before the main house need a Use Permit from the Zoning Administrator.Source The same idea applies to the ADU: it's an accessory to a house, so it comes with or after the main house, not before. The exception is rebuilding after a natural disaster destroyed the main house.Source
Could you build a second home?
Almost everyone with rural land asks this sooner or later. The answer depends on your zoning, where your parcel is, and whether the water and septic can handle it. Three things to know first:
Inland, most lots with a house can add one accessory dwelling unit (ADU) and one junior unit (JADU), no matter how many homes the zoning allows.Source
In rural residential zones, a second full house is allowed only if your acreage supports it under the zoning density, and it needs a permit. Up to four homes per lot, with a Use Permit for the third and fourth.Source
Second home, ADU, JADU or guesthouse?
Four different things, and the county treats each one differently. In short: a second home is a full house that counts against your land's density. An ADU is a smaller, complete home that doesn't. A JADU is a small unit carved out of a house. A guesthouse is a place to sleep, with no kitchen.
| Second home | ADU | JADU | Guesthouse | |
|---|---|---|---|---|
| What it is | Another full single-family house | A complete small home, attached or detached | A unit inside the main house | Sleeping quarters, attached or detached |
| Size limit | The zone's normal house rules | 1,200 sq ft (800 in limited areas) | 500 sq ft | 600 sq ft |
| Kitchen | Yes | Yes | An efficiency kitchen, or use of the main kitchen | No. Not even a microwave or a hot plate. |
| Height | The zone's limit (30 ft in RDR) | 16 ft detached, or more if the zone allows | Same as the house | 15 ft, one story |
| Rent it out? | Check your permit conditions | Yes, for more than 30 days. No vacation rentals. | Yes, for more than 30 days. No vacation rentals. | No, never. A deed restriction says so. |
| Sell it separately? | Not without splitting the lot | No | No | No |
| Counts toward density? | Yes | No | No | No, but only one per lot |
| Permit path | Administrative Permit for a second unit; Use Permit for a third or fourth | Building permit, approved by staff if it meets the rules | Building permit, approved by staff | Building permit, plus a recorded deed restriction |
Sources: the county's ADU and guesthouse rules,Source the Rural Density Residential zone,Source and state ADU law, which says ADUs don't count against a lot's allowable density.Source The guesthouse kitchen ban really does list microwaves and toaster ovens by name.Source
Old county "caretaker" and "senior citizen" units now count as ADUs, and an old permitted guesthouse can be converted into one.Source
How many homes can my land hold?
Work through it in this order. You'll need your parcel's zoning, which the county's Parcel Report shows. See The land and its rules.
- Read the density in your zoning. Rural residential zoning carries a number: "RDR/10" means one home per 10 acres, and "LDR/2" means one per 2 acres.SourceSource Divide your acres by that number. That's the most full homes the zoning allows, before anything else.
- Check for a "first home only" limit. Some areas cap you at one house no matter the acreage. See the list below.
- Count the permits. In LDR and RDR zones, the first house is allowed outright, a second house needs an Administrative Permit, and a third or fourth needs a Use Permit, with a hard cap of four per lot and never more than the density.Source RDR also allows up to three homes on 10 or more acres for an owner, operator or employees working on the site, such as on a farm.
- Add the ADU and JADU. One of each per lot, on top of the houses, where ADUs are allowed.Source
- Prove the water and septic. On a well or septic system, Environmental Health has to find enough water and wastewater capacity for each unit. If it can't, the ADU isn't allowed.Source More houses means more water. See Water and Wastewater.
Farm and grazing zones have their own lists of allowed homes, often tied to the people working the land. If your zoning isn't LDR or RDR, read your district's chapter or ask the Permit Center.
Because of limited water, sewer or roads, the county's ADU rule names these inland areas where new ADUs are generally not allowed:Source
- Land with a "B-8" zoning overlay.
- The North County Planning Area (except the Castroville Community Plan area).
- The part of the Toro Planning Area shown on the General Plan's Figure LU-10, which is limited to the first single-family home on a legal lot (General Plan Policy T-1.7).
- The residential part of the Greater Salinas Planning Area north of Salinas, between Williams Road and Highway 101, also limited to the first home.
- Areas with an adopted Specific Plan, unless the plan allows them.
Even there, state law still allows one detached ADU (up to 800 square feet, 16 feet tall, with 4-foot side and rear setbacks), or one ADU inside the house or an existing accessory building, and a JADU.Source JADUs are allowed everywhere inland, including where new ADUs aren't. Not sure if your parcel is in one of these areas? Ask the Permit Center for a zoning verification letter ($940 in 2026).Source
Who to call
County Permit Center
Zoning, Design Approval, building permits, plan check, inspections, and whether your parcel allows a second home or ADU.
(831) 755-5025 · 1441 Schilling Place, Salinas
County Permit Center →County permit portal
Apply for permits, upload plans, see plan check comments and schedule inspections.
Accela Citizen Access →County Environmental Health
Well and septic sign-offs, and whether they can support a second home or an ADU.
Land use review →Your designer or architect
Check an architect's license. For a building designer or draftsman, check references and recent county projects.
State license lookup →-
1
Before you buy
Ask before you make an offer- What's the zoning and density, and could the land ever hold more than one home?
- Is there a design overlay that means a Design Approval?
- Are there existing structures, and were they permitted? A guesthouse with a kitchen isn't a guesthouse.
- Are there old plans, surveys or reports from a past design attempt?
-
2
Can I build here?
-
3
Design
-
4
Permits
-
5
Build
-
6
Move in and beyond
Real numbers
What the house actually cost, from readers. Every number has a year, because prices move.
| What | Cost | Source |
|---|---|---|
| Design Approval | $640 over the counter, $1,210 administrative, $3,750 with a hearing (2026) | County fee schedule |
| Administrative Permit (for a second home) | $6,860 plus 13% technology fee (2026) | County fee schedule |
| Use Permit (for a third or fourth home) | $12,460 plus 13% technology fee (2026) | County fee schedule |
| Architect, designer or draftsman | No reports yet | Share yours |
| Structural engineering | No reports yet | Share yours |
| Construction cost per square foot | No reports yet | Share yours |
| A detached ADU, all in | No reports yet | Share yours |
Sources
Every fact above links to its source. Checked November 27, 2026, and rechecked monthly.
Not legal or architectural advice. Zoning is parcel by parcel. Confirm with the county before you count on a second home.