Project Map › The house

Design it to fit the land

The house

After the water, the septic, the road, the dirt and the trees, you finally get to the part you pictured in the first place: the house. This guide walks through getting it designed, approved, built and signed off, step by step. And because almost everyone with rural land eventually asks "could I build a second one?", that's answered near the end.

Who's involved
A designer (architect, building designer or draftsman), a structural engineer, an energy consultant, your contractor, and the county: Planning (zoning and Design Approval) and Building Services (plan check and inspections).
What it shapes
The house's look, size and cost, how long the permits take, and when you can move in.
When it matters most
Once the five deal-breakers are answered. Design the house to fit what the land allows, not the other way around.

The house in Monterey County, in four facts

Who designs the house?

Ask any designer

From sketch to move-in

  1. Site plan first. Everything on one drawing: the house, driveway, well, septic field and reserve, water tanks, propane tank, solar, protected trees, slopes and setbacks. The other guides on the Project Map each add a piece.
  2. Concept design. Rough floor plans and the look of the house, sized to the site plan and your budget.
  3. Planning approvals. If your parcel has a design overlay, you need a Design Approval, from over the counter ($640 in 2026) to a public hearing ($3,750).Source Steep slopes, tree removal or other issues can mean a bigger planning permit first. See The land and its rules.
  4. Construction drawings. The full set: architectural plans, structural design, energy code forms, fire sprinklers and fire-safe construction (see Fire safety), plus the septic and well designs.
  5. Building permit and plan check. Apply through the county's online permit portal.Source Reviewers send back "plan check comments," your team revises, and you resubmit until it's approved. What that means. Then you pay the fees and the permit is issued. What it costs.
  6. Build, with inspections. Inspections at each stage: foundation, framing, electrical, plumbing, insulation and more. Don't cover anything before it's inspected, or it gets uncovered.
  7. Final inspection and move-in. Once the house passes final, you can move in. If one last item is holding you up, the county can issue a temporary certificate of occupancy ($1,887 in 2026).Source
  8. Keep every document. Plans, permits, inspection cards, the septic and well records. Future you, your insurer and your buyer will all want them.

What are "plan check comments"?

"Plan check" is the county reviewing your construction drawings before it issues the permit. "Comments" are the list it sends back of everything that's missing, unclear or doesn't meet code. Think of it as the county's red pen. It's normal, and almost nobody gets approved on the first try.

The secret to fewer rounds: answer every comment, completely, in one resubmittal. A half-answered list just comes back. And ask your designer up front whether answering comments is included in their price.

Can you build it in pieces?

Most of us can't pay for the whole thing at once, so the natural plan is a driveway this year, power next year, the house when the money's there. Some of that works. Some of it runs straight into rules that only make sense once the house is permitted, and that's where the circular, chicken-and-egg feeling comes from. You're not imagining it. Here's the map.

What can go first, on its own permit?

PieceBefore the house permit?The catch
Survey, perc test, soils reportYesThey're studies, not construction. The county needs them before it will approve the house anyway, so they're the best early spend. See Wastewater and Ground.
The wellYes, on its own well permitEnvironmental Health issues well permits separately, which is why people drill early to prove the water. An open code violation on the property stops a well permit until it's cleared.Source See Water.
Planning approvals for the whole projectYes, and they're the best place to "park"A Use Permit generally stays good if construction starts within two years of approval, and you can ask for an extension before it runs out.Source See permit clocks.
The driveway (a grading permit)Maybe. Ask.A grading permit is its own permit, but the fire agency's conditions have to be cleared before any grading or building permit is issued,Source and the county reviews the driveway as part of the house it serves, not on its own.Source Once issued, work has to start within 120 days, and a 30-day stop can expire it.Source
Power to the siteTemporary power, yes. Permanent service, ask.PG&E offers temporary construction power, and its online application asks you to upload your permits where they apply.Source Ask PG&E what it needs before it will design a permanent line to a house that isn't permitted yet. See Power.
Water tanksSometimesEven with no building permit, a tank can need a Design Approval in a design-control zone.Source
A barn or shopOnly with a Use Permit (in RDR zones)Accessory buildings before the main house need a Use Permit from the Zoning Administrator.Source
The septic systemNoThe installation permit comes only after the building permit is approved by every agency.Source
An ADU, or living on siteNoBoth come with or after the main house's building permit. See living on site.

The loops that drive people crazy

A phasing plan that works with the rules

1. Prove it Smaller checks, any pace • Survey • Perc test and septic design • Soils report • Drill the well • Five deal-breakers answered 2. Approve it Design the whole thing • Site plan and house design • Planning permits, Design Approval • Fire agency signs off on the driveway • Approvals in hand: a safe place to pause 3. Build it When the money's ready • Building and grading permits • Driveway and fire water first • House, septic, power, utilities • Final inspection, move in
The idea: spend early money on things that prove the land and don't start a construction clock. Pause, if you need to, with approvals in hand. Pull construction permits only when you can carry the work through to the end. Then build in the order the fire code wants: access and water first.

Not sure what the five deal-breakers are? Water, wastewater, access, ground and power. See them on the Project Map.

From our experience

We've had our land for ten years, while the Air Force continued to move us around the world. (We're not settled yet!) We'd have loved to chip away at it: the driveway one year, power the next, the house when we got there. Instead we mostly walked it and dreamed. We planted a tree here and there and scattered wildflower seed, because the rules really want the whole plan, and the money for it, all at once. If that's you, spend what you can on the "prove it" pieces, get your approvals in hand, and let yourself enjoy the land while you save. The wildflowers don't need a permit.

Ask the Permit Center, early

What the building permit costs

County Building Services fees, effective April 4, 2026, are based on the project's valuation, which the county figures from national building cost data, not your contract price:Source

Fee2026 amount
Inspection fee, house valued $500,001 to $1,000,000$5,861.41, plus $2.61 per $1,000 over $500,000
Inspection fee, house valued $1,000,001 to $5,000,000$7,167.68, plus $0.44 per $1,000 over $1,000,000
Plan check, single-family house65% of the inspection fee
Plan check, new ADU up to 750 sq ft, or a JADU32.5% of the inspection fee
Standardized ADU plan review$646
General Plan management and technology fees15% and 13% of the permit fee
Temporary certificate of occupancy$1,887

Those are just Building Services. Planning permits, grading, septic, well, fire, school and traffic fees all come on top. See Money and team for the whole stack and the county's fee estimator.

Living on site while you build

You can live in an RV, travel trailer or mobile home on the lot while you build the first house:Source

Changes to those rules need an Administrative Permit. Eighteen months goes fast on a custom house, so plan the schedule with it in mind.

Build order matters

Want to build the barn or shop first and the house later? In the Rural Density Residential zone, accessory buildings before the main house need a Use Permit from the Zoning Administrator.Source The same idea applies to the ADU: it's an accessory to a house, so it comes with or after the main house, not before. The exception is rebuilding after a natural disaster destroyed the main house.Source

Could you build a second home?

Almost everyone with rural land asks this sooner or later. The answer depends on your zoning, where your parcel is, and whether the water and septic can handle it. Three things to know first:

Second home, ADU, JADU or guesthouse?

Four different things, and the county treats each one differently. In short: a second home is a full house that counts against your land's density. An ADU is a smaller, complete home that doesn't. A JADU is a small unit carved out of a house. A guesthouse is a place to sleep, with no kitchen.

Second homeADUJADUGuesthouse
What it isAnother full single-family houseA complete small home, attached or detachedA unit inside the main houseSleeping quarters, attached or detached
Size limitThe zone's normal house rules1,200 sq ft (800 in limited areas)500 sq ft600 sq ft
KitchenYesYesAn efficiency kitchen, or use of the main kitchenNo. Not even a microwave or a hot plate.
HeightThe zone's limit (30 ft in RDR)16 ft detached, or more if the zone allowsSame as the house15 ft, one story
Rent it out?Check your permit conditionsYes, for more than 30 days. No vacation rentals.Yes, for more than 30 days. No vacation rentals.No, never. A deed restriction says so.
Sell it separately?Not without splitting the lotNoNoNo
Counts toward density?YesNoNoNo, but only one per lot
Permit pathAdministrative Permit for a second unit; Use Permit for a third or fourthBuilding permit, approved by staff if it meets the rulesBuilding permit, approved by staffBuilding permit, plus a recorded deed restriction

Sources: the county's ADU and guesthouse rules,Source the Rural Density Residential zone,Source and state ADU law, which says ADUs don't count against a lot's allowable density.Source The guesthouse kitchen ban really does list microwaves and toaster ovens by name.Source

Old county "caretaker" and "senior citizen" units now count as ADUs, and an old permitted guesthouse can be converted into one.Source

How many homes can my land hold?

Work through it in this order. You'll need your parcel's zoning, which the county's Parcel Report shows. See The land and its rules.

  1. Read the density in your zoning. Rural residential zoning carries a number: "RDR/10" means one home per 10 acres, and "LDR/2" means one per 2 acres.SourceSource Divide your acres by that number. That's the most full homes the zoning allows, before anything else.
  2. Check for a "first home only" limit. Some areas cap you at one house no matter the acreage. See the list below.
  3. Count the permits. In LDR and RDR zones, the first house is allowed outright, a second house needs an Administrative Permit, and a third or fourth needs a Use Permit, with a hard cap of four per lot and never more than the density.Source RDR also allows up to three homes on 10 or more acres for an owner, operator or employees working on the site, such as on a farm.
  4. Add the ADU and JADU. One of each per lot, on top of the houses, where ADUs are allowed.Source
  5. Prove the water and septic. On a well or septic system, Environmental Health has to find enough water and wastewater capacity for each unit. If it can't, the ADU isn't allowed.Source More houses means more water. See Water and Wastewater.
A: 20 acres, RDR/5 1 2 3 4 ADU 20 ÷ 5 = up to 4 houses + 1 ADU + 1 JADU B: 20 acres, RDR/40 1 ADU Below the density: 1 house + 1 ADU + 1 JADU C: "first home only" 1 ADU 1 house, any acreage + ADU up to 800 sq ft + JADU First house More houses (permits) ADU JADU, inside the house
Examples only, as the zoning allows on paper. Water, septic, slopes, fire access and the rest of this guide can still lower the count. A lot with less than the density of one home still gets its first house if it's a legal lot.

Farm and grazing zones have their own lists of allowed homes, often tied to the people working the land. If your zoning isn't LDR or RDR, read your district's chapter or ask the Permit Center.

Where it's "first home only"

Because of limited water, sewer or roads, the county's ADU rule names these inland areas where new ADUs are generally not allowed:Source

Even there, state law still allows one detached ADU (up to 800 square feet, 16 feet tall, with 4-foot side and rear setbacks), or one ADU inside the house or an existing accessory building, and a JADU.Source JADUs are allowed everywhere inland, including where new ADUs aren't. Not sure if your parcel is in one of these areas? Ask the Permit Center for a zoning verification letter ($940 in 2026).Source

Who to call

County Permit Center

Zoning, Design Approval, building permits, plan check, inspections, and whether your parcel allows a second home or ADU.

(831) 755-5025 · 1441 Schilling Place, Salinas

County Permit Center →

County permit portal

Apply for permits, upload plans, see plan check comments and schedule inspections.

Accela Citizen Access →

County Environmental Health

Well and septic sign-offs, and whether they can support a second home or an ADU.

Land use review →

Your designer or architect

Check an architect's license. For a building designer or draftsman, check references and recent county projects.

State license lookup →
  1. 1

    Before you buy

      Ask before you make an offer
      • What's the zoning and density, and could the land ever hold more than one home?
      • Is there a design overlay that means a Design Approval?
      • Are there existing structures, and were they permitted? A guesthouse with a kitchen isn't a guesthouse.
      • Are there old plans, surveys or reports from a past design attempt?
    • 2

      Can I build here?

      • 3

        Design

        • 4

          Permits

          • 5

            Build

            • 6

              Move in and beyond

              Real numbers

              What the house actually cost, from readers. Every number has a year, because prices move.

              WhatCostSource
              Design Approval$640 over the counter, $1,210 administrative, $3,750 with a hearing (2026)County fee schedule
              Administrative Permit (for a second home)$6,860 plus 13% technology fee (2026)County fee schedule
              Use Permit (for a third or fourth home)$12,460 plus 13% technology fee (2026)County fee schedule
              Architect, designer or draftsmanNo reports yetShare yours
              Structural engineeringNo reports yetShare yours
              Construction cost per square footNo reports yetShare yours
              A detached ADU, all inNo reports yetShare yours

              Sources

              Every fact above links to its source. Checked November 27, 2026, and rechecked monthly.

              Not legal or architectural advice. Zoning is parcel by parcel. Confirm with the county before you count on a second home.

              Your checkmarks here also appear on the Project Map. See also The land and its rules, Fire safety and Money and team.